- Dashboard
- Logistics Operational Guide (LOG)
- …
- Logistics Operational Guide (LOG) Home
- Fundamental Logistics
- Assessment and Planning
- Attachments
- LOG-2-1-ASSESSMENT-UN-SDI-Light Railway Obstacles Bridges Assessment.xls
LOG-2-1-ASSESSMENT-UN-SDI-Light Railway Obstacles Bridges Assessment.xls
SDI Light Assessment Form | Route Name: | Source ID: | Source: Logistics Cluster | ||||||||||||||||||||||||||||||||||||||||||||||||
Railways | Obstacles and Bridges | Other | |||||||||||||||||||||||||||||||||||||||||||||||||
From GPS Waypoint | To GPS Waypoint | Rail Weight Distribution (lb/yd) | Maximum Axle Load (MT) | Railway Type (check one) | Power Source (check one) | Operational status (check one) | Is under Construction / Repairs | Damage (check one) | Repairs Type (check one) | GPS Waypoint | Type of obstacle (check one) | GPS Waypoint | Description | ||||||||||||||||||||||||||||||||||||||
Take waypoint number from the GPS receiver. Example: 001 | Take waypoint number from the GPS receiver. Example: 017 | Number of Lines | Gauge (m) | Speed Limit (Km/hr) | Railway track | Siding track | Passing track | Yard | Electrified Track | Overhead Electrified | Non-electrified | Open | Restricted | Closed | Appears intact | Appears damaged | Appears destroyed | Repairable locally | Requires external expertise | Not repairable | Take waypoint number from the GPS receiver. Example: 007 | Mines/UXO | Debris/Wreckage | Downed Electric Lines | Avalanche/Snow | Landslide/Mudslide | Flooded | Wet Crossing | Rail Damage | Bridge | Culvert | Traffic Restriction | Other (specify in notes) | Take waypoint number from the GPS receiver. Example: 011 | Use these fields to mark other information you think useful (villages, important intersections, etc). Or you can use them to record additional notes about road sections or obstacles that you have recorded at left. | ||||||||||||||||
Overview
Content Tools